A Rated HomesDRAFT · info only
← All home types

Rules, costs and installer questions

How it fits together

  1. Fabric first: insulation, draughts, ventilation.
  2. Heat pump (monobloc, R290) for UFH downstairs and hot water.
  3. AC upstairs for heating and cooling.
  4. Solar, battery, EV on a smart tariff.
The rules (Oct 2026)

The Budget on 28 Oct 2026 may change this.

Order of works
  1. Assessment and heat-loss survey (MCS).
  2. Repairs and damp.
  3. Insulation and ventilation.
  4. Electrics and supply upgrade.
  5. Heat pump and emitters.
  6. Solar and battery.
  7. EV charger.
  8. Smart meter and tariff.

  9. Timeline [Indicative]: weeks to months; network and planning approvals cause most delays.

  10. Battery: outdoors, never in lofts or escape routes (PAS 63100).
  11. Network notification: G98 after, G99 before. [Verify: the 16A per phase (about 3.68kW) G98 limit]
  12. Gas cap-off ends the standing charge. [Verify: process and fee vary by network]
  13. Shower heat recovery (WWHRS): optional. [Verify: get product performance data before recommending]
Upkeep
Costs
Installer red flags
Questions to ask your installer
Real-world notes

[Placeholder: notes from one real install (Vaillant aroTHERM heat pump, Panasonic AC, solar on FiT, Octopus tariff), in neutral third person. Add real bills and COP.]